The Real Evergreen Line Story

The Real Evergreen Line Story

Summary: Most people are still asking the question of why the province decided to suddenly switch the Evergreen Line to SkyTrain technology in 2008. I think we should be asking questions about why the LRT design process suddenly stopped, with no reason, back in 2007.


The Evergreen Line is now slated to open in 2017, which just happens to be yet another delay in a consecutive series. Nobody likes delays, and these Evergreen Line delays have injected a new wave of doubt among transit observers here in Metro Vancouver, who may remember a time not too long ago when the Evergreen Line was comparable to a hot potato. That is, hardly anyone could come to an agreement about it.

1998 SkyTrain plans for the Millennium Line. Today’s “Evergreen Line” was supposed to be part of the Millennium Line’s second phase.

During the late 2000s, what is now the Evergreen Line had to go through numerous obstacles, ranging from funding shortages to planning issues to a lack of clarity in the political commitment to the line itself. The Evergreen Line was first proposed as the second phase of what became the Millennium Line SkyTrain, cancelled along with a switch in government, and then brought back to life later on as an at-grade Light Rail Transit proposal on the original alignment.

However, perhaps one of the most perplexing twists in the Evergreen Line story was the controversial change from an at-grade Light Rail Transit system, to the currently-being built extension of the existing SkyTrain system. It took people by surprise, changed the focus of the discussion and was so significant that it caught the attention of transit bloggers in other Canadian cities.

The move was controversial because of the creation of a new business case released by the provincial government (hereafter referred to as the “2008 business case”) that overrode a previous business case released by TransLink (the “2006 business case”) for the Evergreen Line LRT. A following, final business case by the province (the “2010 business case”) adopted the results of the 2008 business case without making major changes to it, or addressing its supposed issues.

The 2008 business case explained that its recommendation for SkyTrain (ALRT) on the current corridor was based on 4 key findings:

  1. Ridership – ALRT will produce two and a half times the ridership of Light Rail Transit (LRT) technology; this is consistent with the ridership goals in the Provincial Transit Plan.
  2. Travel Time – ALRT will move people almost twice as fast as LRT (in the NW corridor).
  3. Benefits and Cost – ALRT will achieve greater ridership and improved travel times at a capital cost of $1.4 billion, with overall benefit-cost ratio that favour ALRT over LRT.
  4. System Integration – ALRT will integrate into TransLink’s existing SkyTrain system more efficiently than LRT.

The new business case recommended SkyTrain based on finding advantages in 4 key areas: Ridership; Travel Time; Benefits and Cost; and System Integration.

Light Rail advocates who looked into the study insisted that the new analysis was biased in favour of SkyTrain, saying it rejected what was an already-sound business case. Some of these people alleged that the switch was a result of insider connections, shady agreements, and other under-the-radar proceedings. 2008 was a time when it wasn’t as clear to people that SkyTrain isn’t a proprietary transit technology and it was probably no surprise that critics of the decision showed up in waves.

These critics were joined by others, including City Councils of the time, who expressed concern about some aspects of the newer business case. Two particular major players come into mind:

1. The City of Burnaby released a staff report that injected doubt into the Evergreen Line’s cost estimates, ridership estimates and evaluation. (See [HERE] for report)

“This report recommends that the Province and TransLink undertake to re-evaluate the choice of technology and prepare a business case of LRT technology for the Evergreen Line based on the concerns and questions raised in this report with regard to service speed, ridership estimates, operating and capital costs, inter-operability, community service and other factors.”

2. A Portland-based transportation engineer named Gerald Fox alleged that the analysis had been manipulated to favour SkyTrain. (The original letter was posted [HERE]).

“It is interesting how TransLink has used this cunning method of manipulating analysis to justify SkyTrain in corridor after corridor, and has thus succeeded in keeping its proprietary rail system expanding.”

At the time, no one could present an argument strong enough to combat what seemed to be a legitimate series of concerns on the SkyTrain proposal. The decisions of 2008 and the surrounding controversy continue to be reflected in the words of today’s writers, most recently surfacing with the announcement of the recent Evergreen Line delay and the ongoing SkyTrain versus LRT debate in Surrey.

It is, however, important to remember that when the Auditor General of British Columbia was asked to look into the Evergreen Line technology switch, the finished report in 2013 concluded that while some information was missing, the switch to SkyTrain was the right decision.

The Auditor General summarized the missing information as a shortfall in explaining the following:

  • Options’ risks, costs and benefits;
  • Assumptions underpinning SkyTrain ridership;
  • Wider transit system risks and dependencies; and
  • How agencies would measure performance

In the approximately 3 years since this Audit was released and the 7 years since the decision to switch to SkyTrain, new information has been released that makes it possible to fill in all four of these gaps, as well as the other concerns raised by critics and the City of Burnaby.

In an effort to compile this new information, I performed the research myself, which included extensively looking into all business cases (2006, 2008 and 2010) and other supporting evidence (including all 61 archived pages of the original Evergreen Line LRT discussion thread on Skyscraperpage).

With my conclusion that the Evergreen Line business case was not manipulated to favour SkyTrain, I present my results below.

1. Were SkyTrain and LRT compared properly?

The first and foremost concern by the auditor general was that the SkyTrain and LRT options may not have been compared properly, citing that numerous numbers in the comparison were skewed and contained significantly shortfalls.

The City of Burnaby’s staff report probably best summarized the issues that were raised surrounding the comparison. They are:

Capital cost estimates

As the capital cost estimates for LRT increased from $970 million (2006 business case) to $1.25 billion (2008 business case) with little explanation, the City of Burnaby complained that this increase was unreasonable – especially as it brought the cost difference with SkyTrain down to a mere $150 million (12%). Light Rail advocates and critics, including Gerald Fox, complained that the cost increase was manipulated to favour SkyTrain.

It was noted in the 2006 study that the cost estimate of then was done at a 90% preliminary design stage – not a fully detailed design stage presenting a finalized cost. It thus seems conceivable that costs increased while the final alternative was being analyzed for the 2008 business case.

Recently I performed some research on the capital costs of Canadian rail transit systems. With several rapid transit and light rail systems now proposed across the country, I took the opportunity to compile an inflation-adjusted comparison of the projects’ capital costs – adjusting each project for the amount of grade-separation (tunnelled, or elevated) and using that as a guideline to compare the costs. This extensive research took me several weeks to complete as I had to manually measure most of the proposals to assess the amount of grade-separation.

See: Capital costs of Canadian rail transit systems

Unsurprisingly, I reached the conclusion that – with the steepest trend in perecentage-to-cost – bored tunnel is the most expensive alignment to construct.

The Evergreen Line, no matter whether it were to be SkyTrain or Light Rail Transit, has a 2km bored tunnel as a part of its alignment through the mountainous terrain between Burquitlam and Port Moody. This accounts for about 20% of the entire route.

The Evergreen Line's 2006 estimate is marked by the "$99" at the bottom left. The 2008 estimate is the $112 above it.
(Open to enlarge) – The Evergreen Line’s 2006 estimate is marked by the “$99” at the bottom left. The 2008 estimate is the $112 above it.

My measurements indicated that the 2006 cost-per-km estimates were the lowest of the other projects. The estimate was significantly below other projects with a ~20% bored tunnel percentage, and below the average trend line that related percentage in a tunnel to rapid transit cost per km.

In other words, the 2006 cost estimates are too low and were probably incorrect.

Now that we know how much trouble it took to construct the Evergreen Line’s 2km tunnel, it’s certain that the LRT project’s final cost would have come closer to $1.25 billion. LRT tunnels need to account for pantographs and higher vehicle heights; whereas the linear motors used on our SkyTrain technology lines are more optimal for tunnels as the train is lower and closer to the ground. As a result, an LRT tunnel would have been larger and more complex and would have likely lead to additional potential problems, necessitating a higher contingency budget.

Just imagine what kind of liability chaos there’d be if a sinkhole did open under a home above the tunnel route. It hasn’t happened with our SkyTrain tunnel, but it’d be more likely under a larger tunnel (and a larger, more powerful tunnel boring machine) needed for an LRT tunnel.

Operating costs

Most critics were adamant to point out that the operating costs rose from $12.21 million in 2006, to $15.3 million in 2008 (both measurements were in 2007 dollars). What was overlooked by these critics is that the cost increase can be explained by a difference in service frequency.

The 2006 business case’s estimate was based on a 6 minute initial operating frequency. The 2008 business case’s operating costs were based on a higher 5 minute initial operating frequency to presumably make the LRT service more competitive and boost its business case (the higher frequency would have also added additional trains, explaining part of the capital cost increase). Whereas the 2008 cost estimates are 25% higher while a 5 minute frequency is 20% higher than 6, the newer numbers seem just about right to me.

Travel times

The City of Burnaby’s assessment of travel times suggested that the SkyTrain alternative’s travel time estimates were far too high and the LRT alternative’s estimates were far too low. It provided this graphic to show the disparity:

Evergreen Line graphic
Open to enlarge

Burnaby complained that the Evergreen Line’s LRT speed estimates were lower than two existing LRT systems in Canada (Calgary and Edmonton).

However, most of Calgary and Edmonton’s LRT systems are built off-street, and with gated crossings and absolute priority like railway systems. Most of the Evergreen Line as an LRT would be in the middle of streets and would have to follow the roadway speed limits (typically 50-60km/h). Naturally, this would result in slower average speeds than Calgary and Edmonton, where trains may run at 80km/h on dedicated rights-of-way.

While the SkyTrain alternative had much higher average speeds than the existing Expo & Millennium Lines (average of 43km/h), the addition of Lincoln Station to the proposal has added some length to the travel time to the extent that the Evegreen Line’s end-to-end travel time is now usually described as 15 minutes – an average speed of 43.6km/h.

At the end of the day, these differences aren’t really dictated by the transit technology. The Evergreen Line will have the system’s longest station-less segment, which is largely in part due to the 2km tunnel between Burquitlam and Port Moody stations. The higher average speeds near here would be comparable to other long sections crossing geographical features, such as the 2.3km SkyBridge segment on the Expo Line over the Fraser River.

Maximum speed

Gerald Fox also raised an issue that the stated maximum LRT speed in the 2008 business case (60km/h) was lower than the potential speed limits that could be achieved in the off-street, 2km tunnel – claiming that the 2006 business case accounted for faster running speeds of up to 80km/h inside the tunnel.

However, the end-to-end travel time estimates in the 2008 business case were actually lower than that of the 2006 business case by 0.4 minutes.

The 60km/h expression in the 2008 business case was probably meant to highlight the speed on most of the on-street sections (outside of the tunnel), which accounted for as much as 80% of the route.

In conclusion

Based on the data I’ve collected above it is clear that SkyTrain and LRT were not compared unfairly.

There is little reason to believe that the 2008 business case was wrong in assumptions. There could’ve been better distribution of the info at hand, and some improvements in the planning process (like the addition of Lincoln Station from the beginning). However, no skewering of the numbers and manipulation to favour SkyTrain has taken place.

2. Was ridership over-estimated?

Ridership was an additional concern raised by the City of Burnaby, which complained that the ridership estimates for the SkyTrain option (at 2.1 million passengers annually/km) were too high,  and that the LRT ridership estimates were too low. Burnaby complained that the 2008 business case did not provide a proper explanation of how ridership was estimated.

Open to enlarge
Open to enlarge

The LRT ridership estimates were said to be too low because they were lower than two existing Canadian LRT systems (40% lower than Calgary, and 9% lower than Edmonton). For the same reasons as I explained above, it’s not possible to put the Edmonton and Calgary systems in the same category as an Evergreen Line LRT. The Evergreen Line LRT is largely on-street; the Calgary and Edmonton systems are not, and tend to run on exclusive rights-of-way at speeds of 80km/h.

This leaves the high ridership estimates with the SkyTrain system. The auditor general raised an issue that the SkyTrain ridership assumptions with the Evergreen Line were made with assumptions that a completed transit network would be built by 2021 following the 2008 Provincial Transit Plan. This included SkyTrain extensions in Broadway and Surrey, neither of which will be built by 2021 based on the current situation.

Burnaby complained that at 2.10 million annual passengers per km, the estimates were higher than the existing SkyTrain system (1.60 million annual passengers per km) and thus much higher than would be realistic.

However, it’s important to note that the SkyTrain ridership estimate in Burnaby’s report was taken before the Canada Line to Richmond was introduced in 2009. The Canada Line’s opening broke ridership records with ridership almost immediately shooting up to its current level of 40.2 million passengers per year or over 120,000 per weekday – numbers that were well ahead of schedule even beat entire, city-wide LRT systems in ridership.

When this annual ridership is worked out per-km, the Canada Line is carrying 2.10 million annual passengers per km – the same amount that was projected for the Evergreen Line – and as such is also contributing to an increase in the system-wide value.

As costly as infrastructure like the Canada Line SkyTrain is, the investment has been proven worthy by the benefits to the tens of thousands of people using the system daily. The investment confidence that has resulted in our SkyTrain system expansions needs to be applied to the whole system.
As costly as infrastructure like the Canada Line SkyTrain is, the investment has been proven worthy by the benefits to the tens of thousands of people using the system daily.

A huge part of the reason the Canada Line was so successful was because efforts by the City of Richmond to make the elevated segment on No. 3 Road at-grade (like a light rail system) were defeated, resulting in the construction of a fully grade-separated line. The full grade-separation enabled higher trip speeds, which have been cited in rider surveys as the #1 most-liked aspect of the Canada Line system – outpacing every other favourable aspect mentioned by riders.

The Evergreen Line’s SkyTrain switch decision was largely based on favouring the faster travel-times and transferless journeys of a SkyTrain system. It’s thus conceivable that the Evergreen Line could see the same kind of ridership success that the Canada Line did.

3. Were the risks properly and thoroughly assessed?

The auditor general commented that the 2008 and 2010 business cases did not provide information on the risks that came with connecting Evergreen Line outcomes with the performance of other parts of our regional transit system. In particular, the Evergreen Line’s performance estimates did not account for the potential impacts of:

  1. the level and coverage of bus connector services on ridership;
  2. parking at the more popular Evergreen stations;
  3. changes to the West Coast Express (WCE), which provides peak commuter services for passengers who want to travel between the northeast Metro Vancouver and downtown Vancouver
  4. Evergreen services on those parts of the SkyTrain system that are near or at capacity in the commuting peak periods (for example, around Broadway station).

These concerns present significant risks and it is of my opinion that they should have been addressed.

However, accounting for these risks whenever a large transit priority is laid out in our region is hardly ever common practice. Today’s transit projects have continued the practice of tying performance estimates to grandiose plans for the rest of the regional transit system, like the transit vision crafted by the Regional Mayors’ Council that was defeated in the March 2015 referendum.

When the 2015 referendum was defeated, so too were the additional commitments to connecting bus service that would have been critical to the success of the included rapid transit projects. It’s raised concern among decision-makers such as Coquitlam Mayor Richard Stewart, for example, who raised a concern with the potential costs of increasing parking as additional bus services connecting to the Evergreen Line were rejected along with the other proposals.

Nevertheless, local governments have forged ahead in planning for these lines, despite the new risks created with the lack of a regional vision component. As I believe that there will be opportunities in the future to return to those other critical transit priorities, continuing planning anyway – rather than letting all transit priorities come to a halt – is the best practice.

4.  How are we going to measure performance?

The last issue concerned the collection of performance data to measure performance after the line’s opening. No framework had been set in the 2008 and 2010 business cases, and the lack of such a framework would have a consequence on future transit planning.

However, the Auditor did acknowledge in his report that a framework could still be completed in time for the line’s opening. Although it remains to be said if the province has followed through on this recommendation, this issue isn’t relatively as much of a concern as the others as it has an immediate, clear solution.


So what’s the real “Evergreen Line Story”?

When the Evergreen Line was changed to a SkyTrain extension project in 2008, the switch came after an extended halt in design work and public consultation.

Like today’s rapid transit projects, the Evergreen Line was determined through a multiple-account evaluation that includes a Phase 1 (draft option comparison), Phase 2 (detailed option comparison) and a Phase 3 (finalized option comparison and detailed design).

The 2006 study was finalized at the phase 2 stage, and it noted that its cost estimates were done at the 90% preliminary design stage.

After that, there was silence in the project design work.

At the time, there were plenty of issues around project funding (which can be backtracked to on the Skyscraperpage archives). I can understand delays with transit funding (still a very big issue with projects today). However, the funding issue shouldn’t have delayed detailed design work on the Evergreen Line LRT project. For awhile we didn’t hear anything from planners, politicians or anyone involved regarding the project’s design until rumours of a major announcement surfaced in January 2008. The final business case that was then released in February had been completed by the province rather than TransLink.

For awhile we didn’t hear anything from planners, politicians or anyone involved regarding the project’s design

So it honestly has me raising questions: what exactly was going on? Why did Evergreen Line design works come to a stop, and why didn’t the next phase of consultations take place? Did planners at TransLink realize they under-estimated the LRT costs, and had nervousy about going public with the news? Did local governments start losing confidence in the at-grade project’s business case?

There’s all these disconnects that don’t seem to make sense, and I would argue that this should have been of far greater concern than the provincial government’s decision to switch the project to SkyTrain. It’s not the province’s fault the planning department of the time had decided to cut us off for just over a year on the project’s progress. It’s almost as if the sudden switch to SkyTrain was a measure to deal with these serious problems.

All I do know is that in October 2007, the B.C. Finance minister came to the public with a statement that the Evergreen Line’s progress had indeed been frozen, but that it wasn’t due to the funding shortfall

Finance minister Carole Taylor: The premier did say last week that the Evergreen will be built. The funding is not holding it up. They haven’t decided on exactly the route and exactly the stops. So, we have made the commitment to financially be there when everybody’s ready to go.

(Above quote from: Evergreen Line not held up by funding, finance minister says – Coquitlam NOW)

This almost certainly indicates that the LRT planning department had run into issues with the design, since the 2006 business case had anticipated the start of construction by September 2007.

Instead, in October 2007 the design hadn’t been finished and the planners in-charge “hadn’t decided on exactly the route and exactly the stops.”

You be the judge, but it sounds a heck of a lot like that the province managed to narrowly get us out of an Evergreen Line LRT fiasco in its decision to build SkyTrain instead.


Jaded by SkyTrain and a lack of LRT

There hasn’t been a single, grade-level Light Rail project approved in this region except for the currently proposed project in Surrey, and that’s probably what has raised the irk of some people who have been enthusiastic about the idea of at-grade rail. It’s probably why there’s a commonly-held belief that only provincial government overrides result in SkyTrain, and that at-grade Light Rail systems don’t have major shortfalls of their own that have resulted in their rejection here in Metro Vancouver so far.

However, the argument that lack of at-grade rail infrastructure in this region really caused us to lose out on transit benefits (i.e. we could have built a bigger transit network!) is entirely debatable. The benefits of SkyTrain should be clear to decision-makers, planners and transit enthusiasts in our region.

Despite the constant use of grade-separation and SkyTrain technology, Metro Vancouver’s SkyTrain network expanded at a faster pace than any other system in Canada. Vancouver’s rapid transit growth has lead Canadian cities – and when the Evergreen Line opens to the public next year, we’ll have the longest rapid transit system in Canada spanning nearly 80km – and the longest driverless transit network in the world. The lower operating costs of driverless trains make it possible to keep expanding our transit network without bankrupting our operating budget on the cost of drivers.

Despite the constant use of grade-separation and SkyTrain technology, Metro Vancouver’s SkyTrain network expanded at a faster pace than any other system in Canada.

SkyTrain also has the highest ridership of any rapid transit system in North America that isn’t classified as “heavy” rail. At nearly 9,000 boarding passengers per kilometre, SkyTrain outperforms every single at-grade rail system in Canada and the U.S.

SkyTrain ridership/km vs. other transit systems

Data is from the American Public Transit Association (Q3 2014) unless stated

City System name (type) Weekday daily boardings Daily boardings/mile
Vancouver SkyTrain (driverless) 377,900 8,870
Calgary C-Train (LRT) 310,700 8,510
Boston MBTA light rail (LRT) 214,500 8,250
Edmonton Light Rail Transit (LRT) 98,144* 7,550
Toronto Streetcar (on-street) 281,900 5,525
San Francisco Muni Metro (LRT) 145,500 4,076
Houston METRORail (LRT) 45,700 3,571
Newark Newark/Hudson Bergen LRT 72,939** 3,143
Minneapolis METRO Light Rail (LRT) 64,500 2,938
Los Angeles Metro Rail (LRT) 203,400 2,892
Seattle Link Light Rail (LRT) 40,300 2,330
Portland MAX, Streetcar (LRT) 113,900 2,330
San Diego Trolley (LRT) 124,100 2,320
Phoenix Valley Metro (LRT) 41,200 2,060

* Q3 numbers were not reported. Data from Edmonton Transit, collected during the same period, used instead.
** Q3 numbers were not reported. NJ Transit’s own FY2014 data is used in place (the same number is reported in APTA’s Q4 ridership report).


On top of everything, SkyTrain has made us one of the most successful metropolitan areas in transit ridership with an annual ridership per capita that is 3rd highest on this continent (beat only by New York City and Greater Toronto)

Region Population Annual Ridership
(thousands)
Annual Ridership
(per capita)
New York City 19,831,858 3,893,854 196
Greater Toronto 5,583,064 1,003,230 180
Metro Vancouver 2,313,328 363,163 157
Calgary 1,120,225 157,325 140
Montreal 3,824,221 433,710 113
Boston 4,640,802 399,594 86
Washington, DC 5,860,342 456,915 78
San Francisco Bay 6,349,948 476,219 75
Chicago 9,522,434 658,203 69
Philadelphia 6,018,800 336,981 56
Los Angeles 13,052,921 620,903 48
Seattle/Puget Sound Region 3,807,148 175,215 46

Data above from South Fraser Blog

With these thoughts laid out, I’d like to see anyone try to claim that decisions resulting in SkyTrain projects over LRT are solely a result of senior-government overrides.

…or that anyone’s manipulating data to favour SkyTrain in rapid transit studies, because that’s simply not true.


Featured: Evergreen Line construction image posted by nname on SkyscraperPage

Sendai celebrates SkyTrain technology with opening of new Tozai Line

Sendai celebrates SkyTrain technology with opening of new Tozai Line

sendai-map
Sendai Subway map showing the new Tozai Line (east-west line in blue)

The sun is rising over a quiet city, where the lights inside 13 new rapid transit stations turn on and the first station staff make their way down the relatively unused escalators to prepare to open the platforms for the first wave of customers.

The familiar hum of a linear induction motor system populates the station as the first of 15 four-car trains rolls in from the maintenance yard, ready to board passengers for the first service of the day.

If you think I’m describing an event in Vancouver, you would be wrong because I am describing what’s happening right now in a major Japanese city, one that decided to build a brand new rapid transit line with the same SkyTrain technology developed in Canada and pioneered here in Vancouver.

See: New subway line opens in disaster-hit Sendai – The Japan Times

Sendai, Japan is the city that was hit hard during the March 11, 2011 Tohoku earthquake and tsunami. The completion of the new Tozai Line, a 14km rapid transit subway with both underground and elevated stations, has turned the page for the city, marking its vibrance and prosperity as it progresses in its recovery from the devastation of 4 years ago.

I went back to Sendai for a business trip, and it also happened to be the day the Tozai line opened to the public. It was crazy! The city and its people are treating it like a big event!
-Ryukyurhymer from Skyscrapercity (LINK)

This slideshow requires JavaScript.

Videos and photos of the launch celebrations show thousands of people making use of the new system, and celebrations ranging from idol girl groups performing on the station platforms, local sports team mascots out to celebrate, men in samurai outfits, traditional dance performances on board the trains, and picnics at the park beside the train’s visible elevated section. It is a lively hustle and bustle and the mood appears to be as festive as when I visited Sendai just 4 months ago to attend the city’s most famous Tanabata Festival, as part of my 1-year Japan studies journey. It is arguably the biggest occurrence in the city since this August and the biggest revolution for the city since the first steps in recovery were made after 2011.

Pictures from TransLink of mockup Mark III Skytrain vehicle
SkyTrain technology was developed in Canada and pioneered right here in Vancouver.

Since the first km of demonstration track opened in early 1983 here in Vancouver, SkyTrain technology has made its way around the world with just over 20 systems complete or being proposed in 15 cities worldwide. We have reinvested in it and expanded our system several times, yet we’ve been overtaken by a certain Guangzhou, China that has made a monstrous investment in this technology with over 99km of track – reaching 130km by next year.

Sendai’s will to revitalize their city with the help of a technology pioneered here in Vancouver, Canada should be seen as a wonderful treat and a mark of our contributions to this technology’s progress, and a reminder of the big impacts we can make with choices that we would otherwise deem irrelevant. Sendai’s choice of SkyTrain technology will help the city fast-track its ongoing recovery from the events of 4 years ago.

The line will serve 80,000 riders a day next year, with an additional 3% more estimated to come each year and grow the system’s ridership. According to the schedule on the city’s website, trains will run every 3-4 minutes during peak hours and no less frequently than every 7.5 minutes at off-peak times and weekends – an excellent service standard for a medium-sized city of 1 million people.

This slideshow requires JavaScript.

The new line is already enabling new transit-oriented development nodes in the city, maximizing the line’s potential and giving a nod to the transit-oriented development practices that Greater Vancouver pioneered for every city in North America.

In an area around Arai Station, work to establish a new community of nearly 20,000 people is progressing. Public apartments have been built for those affected by the tsunami, with people moving there from areas closer to the Pacific coast as part of a collective relocation program. (The Japan Times)

We should celebrate a technology that’s made an impact around the world

As a result of the practical research for three years from Fiscal 1985, we confirmed that low-cost subway “Linear Metro” that has been developed as a public transport is suitable for regional hub city as a semi-main metropolitan line or branch line. For this reason, the Japan Subway Association established the “Linear Metro Promotion Headquarters” within the association in October 1988.

ml98pr_fig2
Comparison of conventional subways and linear motor subways. From Osaka Municipal Transportation Bureau’s info page on LIM technology

Japanese researchers started studying linear induction motors (LIMs) as train propulsion in 1985. After Osaka built Japan’s first LIM line (the Nagahori Tsurumi-Ryokuchi line), it was found that the city had saved approximately 20% in construction costs. This is one of the key advantages that come with LIMs – the less-complicated motors enable trains to have lower platform heights, which  means tunnels can be significantly smaller and less costly without impacting the quality of service. There is no doubt that with the majority of Sendai’s new subway line tunneled, millions in cost savings were found with the use of SkyTrain technology.

This same advantage was directly to blame for the use of an existing railway tunnel on our Expo Line SkyTrain downtown, a choice that saved us hundreds of millions of dollars as a traditional light rail system would have required new and larger tunnels to be dug under our downtown core.

“The new line is a symbol of development for the disaster-hit Arai district. I hope the Tozai Line will play a major role in leading the city.”
– Emiko Okuyama, Mayor of Sendai (The Japan Times)

See also: List of Linear induction motor rapid transit systems

Sendai’s system brings the amount of in-service SkyTrain technology systems from 17 to 18. 14 cities/areas are currently using SkyTrain technology, and a 15th (Okinawa Island, also in Japan) has declared its use for a major future transit investment.

I am pleased to hear about and report on this successful launch, and I encourage all of us in Vancouver to cheer this Japanese city and its people in celebrating a brand new era of progress and motion.

Local news report (Japanese)

Watch trains arrive and depart at Sendai Central Station

SkyTrain technology is not outdated and not proprietary

SkyTrain technology is not outdated and not proprietary

RE: Critics say SkyTrain technology is outdated – Global News

Sendai header version
Pictured above: The newly-opened Tozai Line in Sendai, Japan uses SkyTrain technology.

Nathan Pachal was incorrect in stating that Bombardier “dictates what we’re going to do in our region” in a recent interview with Global BC, and I couldn’t have been more disappointed at what he said. I couldn’t have been more disappointed with the report either, which claimed and brought attention to SkyTrain technology being “outdated” and a “boutique system is made by only one company.

This is misleading and untrue, and I have proven this many times in my research and advocacy efforts throughout the past few years.

SkyTrain technology is proven, efficient, and used around the world in more than just a handful of cities. The idea that SkyTrain is a single-company offering, and that it’s outdated, comes down to a lot of miscommunication, misinformation and the sheer lack of information in discussion circles here. It’s important to get some perspective, so firstly…

What is “SkyTrain technology”?

Used in our Expo and Millennium Lines, SkyTrain technology basically comes down to two unique aspects:

  1. Automatic train control (ATC)
  2. Linear induction motor (LIM) propulsion

See: NEARLY ONE IN FOUR METRO CITIES HAS AT LEAST ONE AUTOMATED LINE

Longest metro systems
The world’s longest automated metro systems are in major global cities including Dubai, Singapore, Paris and Tokyo, among others.

The former (automatic train control) has become the global standard in rapid transit, with more than 1 in 4 cities now having at least one automated metro line as part of their system, according to the Automated Metros Observatory. There are 732km of automated metro lines, and the observatory expects this to triple in the next 10 years.

I can imagine that the latter (LIM propulsion) has become the popular subject of contention – since only 5 systems have been built if you only count the systems installed by Bombardier.

However, if you count all of the other systems offered by other companies, LIM technology is now used in over 20 systems in cities around the world, including many busy, large-scale systems in China and in Japan.

Bombardier isn’t the only manufacturer of LIM cars

See also: List of Linear Induction Motor rapid transit systems

Osaka's Nagahori-Tsurumi-Ryokuchi line was the first of numerous linear motor train lines.
I took this photo when I was visiting Osaka in March of this year. Look, a reaction rail!!!

The biggest thing we misunderstand is that we think Bombardier is the “owner” of LIM technology and is the only manufacturer and provider of LIM cars. This is false.

In the city of Guangzhou, China, the world’s largest linear motor train system has over 100km of track. Already, three train lines in the city are using the technology and are responsible for carrying hundreds of thousands of passengers each day.

These are some of the newest subway lines that have been built in the city. One of them, line 6, opened just 2 years ago and is now the busiest line in the whole city.

The 3 Guangzhou metro lines use cars that were jointly manufactured by ITOCHU and CSR-Sifang. Meanwhile, in some of Japan’s biggest cities, Kawasaki Heavy Industries has manufactured LIM transit cars for systems serving hundreds of thousands of passengers a day in Kobe, Osaka and Tokyo.

sub_i_20150330_h_1
Brand new linear motor trains on Tokyo’s Oedo Subway line were made by a different manufacturer than the one that made the first-generation cars.

Kawasaki isn’t the only Japanese manufacturer of LIM cars. The upcoming system in Sendai is being supplied by Kinki Sharyo, and the Fukuoka system was supplied by Hitachi.

The Oedo subway line in Tokyo, one of the busiest lines in the city, is using several different manufacturers’ offerings: the first generation cars were manufactured by Nippon Sharyo and Hitachi, while new-generation cars delivered just this year were made by Kawasaki Heavy Industries. Tokyo’s example is proving that more than one manufacturer can be the supplier of linear motor trains.

These companies aren’t unaware of each others’ presence and do work with (and compete with) each other. They have even collaborated on certain occasions (as an example, Bombardier supplied bogies for some of Guangzhou’s metro cars – while Mitsubishi supplied the actual linear motors).

These cities chose SkyTrain technology for various reasons, one of the most popular reasons being the reduction in tunnel sizes and – as a result – the reduction in capital costs for building the system. In Japan, SkyTrain technology systems are directly promoted as a way of saving money.

See also: Linear Metro promotion page by Japan Subway Association

New systems are being announced and built very often, speaking to the success of this technology. The systems are responsible for moving many more people than even SkyTrain does – and do so reliably, every single day.

The newest system is opening in just 7 days in Sendai, Japan. I am looking forward to the launch celebrations.

Above: A promotional video for Sendai’s upcoming Tozai Line, showing the use of SkyTrain technology. The Tozai Line opens on December 6.

This technology is still very much being developed

Last month we were greeted by the arrival of the first “Mark III” SkyTrain vehicles. Bombardier’s Innovia Metro 300 product is the newest generation of Bombardier’s offering of SkyTrain technology. It has won orders here in Vancouver, for an expansion in Kuala Lumpur, Malaysia and – of all places – for a new rapid transit line in Riyadh, Saudi Arabia.

The renaming of what was previously called “ART” (Advanced Rapid Transit) into a “Metro” class product shows that Bombardier is as committed to keeping up with the development of linear motor propulsion technology, as its competitors are in China and Japan.

But what about all the breakdowns?

I’ve been feeling that SkyTrain technology critics would be motivated to speak as such due to the intensity of the recent SkyTrain breakdowns. For this, it’s important to get some perspective – particularly on what’s been causing some of these incidents to occur.

skytrain-control-cc-by-nc-sa
Track displays at SkyTrain control in Burnaby

Many of the recent break-downs on SkyTrain have been made worse by a particular shortfall that was identified in the commissioned SkyTrain performance review.

In the 1990s, BC Transit decided not to add a simple component to the automatic train control system which would have allowed the system to recover more quickly when a train is stalled. Other driverless transit systems have installed this component and thus do not face this particular problem.

From the independent SkyTrain performance review:

The SELTRAC technology of the 1980s has been upgraded with new control and software elements. SkyTrain was upgraded to the 2nd generation of the SELTRAC technology in 1994. However, SkyTrain did not include the auto-restart module that was available. Therefore, in a temporary loss of communication from the VCCs or VOBCs, SkyTrain SELTRAC technology still requires each train to be manually introduced into the control computer system.

Averaging 5-10 minutes per train to enter the necessary data, this equates to approximately 5 hours to fully recover operations, as there are approximately 40-58 trains operating depending upon when a service delay related to a train control communication failure occurs.

TransLink has identified the addition of this system as an immediate priority, but it may not be happening for another 5 years as the installation is a complex undertaking.

If BC Transit installed it 21 years ago, it would have been in place before the Millennium Line was built and we would be saving a lot of time with recent issues.

See: Fast SkyTrain restart 5 years away – Surrey Leader

Other breakdowns simply amounted to – in the case of last week’s incident – misplacement; – in the case of one of the 2014 breakdowns – human error; or – in the case of both the recent birds nest fire and tree hitting train incident – sheer bad luck.

Perhaps some of these breakdowns have resulted from the particulars of how our system was designed. Regardless, any transit system is prone to a breakdown of some sort. There are many different reasons.

breaker
At the same time as the SkyTrain incidents last week, a light rail train struck a pedestrian in Seattle and caused a 3-hour closure of the line in that area. Courtesy KIRO 7

My last blog post (We can learn from Japan on transit delays/incidents) was about a similar transit mishap in Japan last week on the JR Kobe Line, due to a fallen power pole. This is a conventional electric train line with rotary motors.

And, it seems no one knew about this but on the same day (and at the same time) as the SkyTrain breakdown of this week, Seattle’s LINK Light Rail line faced a 3 hour closure and disruption, when a pedestrian was struck by a train on an at-grade section.

What about the Scarborough RT?

You definitely can’t excuse the fact that Toronto wants to shut down the Scarborough RT, one of the first SkyTrain lines built and in-service, and replace it with either an extension of the Eglinton Crosstown LRT on the same route – or an extension of the Bloor-Danforth Subway line.

However, I reckon that the conversion and replacement has more to do with the desire to provide a through service with these other lines and reduce transfers. From a transportation planning perspective, that’s a very natural thing to want to have. It’s part of why the City of Vancouver has preferred that the “Broadway Subway” be built as an extension of the existing Millennium Line and not in any other way.

However, it’s also importance to have some perspective. The Scarborough RT was the first SkyTrain-technology line ever built, and was converted from what was supposed to be a standard extension of the Toronto streetcar system. The system was built to run only shorter Mark I cars, with newer Mark II cars deemed incompatible without a refurbishment.

Scarborough RT
The Scarborough RT was built well before a “Mark II” train car was even considered as part of the design.

This refurbishment was in fact studied, and was valued at $360 million. Going with a refurbishment was considered one of the most cost-effective ways to improve transit to Scarborough. The existing line and stations would be rebuilt to accommodate newer Mark IIs and Mark IIIs, and so provide a better service.

It would have cost less than rebuilding the line as an LRT system to integrate with the Crosstown line, and far less than building a new subway. It would have also avoided 28 additional months of transit service disruption for riders in Scarborough.

542-transit-chart
See: Our neglect of Scarborough RT is shameful: James – The Star

For whatever reason, be it political or otherwise, this suggestion fell on deaf ears – and that has been the subject of plenty of criticism. Transit planners in Toronto have condemned the neglect of the Scarborough RT’s infrastructure, calling it “shameful” and “inefficient”. It is pointed out that a January 2013 report by the TTC, commenting on the technology matter for a Scarborough rapid transit project, explicitly stated that:

“Notwithstanding criticisms and misinformation over the years, the Scarborough RT has been the single most-reliable service operated by the TTC. The service has been very successful at attracting ridership and has been operating over-capacity for a decade.” (2013 TTC report – page 9)

In addition, the Scarborough RT is run with drivers who operate the doors – breaking the fully-driverless design standard to which it was built to. As Toronto has not seen the full benefits of running ALRT the way it was designed, it’s hard to consider today’s judgement of replacing/shutting down the RT fair or unbiased.

2 years ago, Michael Schabas, a UK-based railway consultant of the Neptis Foundation, published an excellent report hypothesizing that the acceptance of SkyTrain technology in Greater Toronto could have saved billions of dollars and prevented a lot of the choking debate that’s put transit expansion there at a standstill today.

See: Toronto rapid transit review recommends SkyTrain expansion over LRT

Reports and viewpoints like these provide great insight and in my view are worth serious consideration. We all lose when someone is dismissive to consider really great alternatives, and ignores facts when there are facts at hand.


Help me put an end to the misinformation

Share this article on Twitter, Facebook and with anyone you know who’s concerned on transit matters. I believe that regional transit planning has been damaged significantly by misinformation like this, and it’s time to put it to an end for good.

I urge everyone reading this to help me spread the word and help me pressure Global into allowing me to respond to their article.

 

We can learn from Japan on transit delays/incidents

We can learn from Japan on transit delays/incidents

Video shows that in Japan, even the train evacuations are orderly 【RocketNews24】

As reliable as Japan’s public transportation system is, with so many trains running from morning to night, eventually some sort of problem is going to occur. Passengers heading to work or school in central Kobe had their commute interrupted at approximately 8 a.m. on November 16, when it was discovered that an overhead line had snapped on the Japan Railways (JR) Kobe Line between Kobe and Motomachi Stations.

Seeing that the repairs would take some time to complete, some 5,000 passengers were instructed to leave the carriages, which were stopped in an empty stretch of the tracks, and walk to the nearest station, as directed by JR staff who were on the scene.

Even in Japan, which is known for having one of the world’s supposedly most “punctual” train systems, delays and incidents can occur. Last week in Kobe, this was the scene on the city’s main JR rapid transit line after an incident with an overhead power-line was found, requiring a full shut-down of the system in Kobe and service disruptions throughout the 194km-long intercity rapid transit line.

If this sounds familiar, that’s because it does resemble some of the incidents that have plagued our SkyTrain system here in Metro Vancouver over the past few years.

I’m also sure many of you are aware of what happened to the SkyTrain yesterday (November 24th), when it was shut down in downtown due to a “power failure” incident that turned out to be a ‘one-in-a-million’ misplaced replacement rail part that moved on the tracks and struck/damaged the power shoe of an oncoming train.

Map of JR train lines in the Osaka/Kansai area. The blue line going west-east from Himeji to Maibara through Kobe, Osaka and Kyoto was the line affected.
[OPEN to enlarge] Map of JR train lines in the Osaka/Kansai area. The blue line from Himeji in the west to Maibara in the east was the line affected.
I was in Japan last week and happened to actually experience the Kobe incident in the video at the top of this post, although I wasn’t in Kobe when it occurred. Instead, I felt the ripple effects over 140km away at Maibara Station, on the eastern end of the line, as I transferred from another train from Nagoya intending to ride this particular line en route to Kyoto.

The featured photo at the very top of this post is my own picture of the “trains delayed” notice display I ran into when I arrived at Maibara Station. I could feel my stomach churn even more when I checked the departure time-boards on the station platform itself, which showed that westbound express trains had been completely cancelled.

This left me and perhaps several hundred other passengers waiting on the platform before having to crowd onto a smaller local train, which we would ride until another station down the line (Yasu) where express trains would re-commence. The incident was uncomfortable, cost me nearly 90 minutes in delay and had a major effect on my plans for the day.

This is, incidentally, longer than the approx. 60 minute delay I experienced yesterday when I was caught in yesterday’s SkyTrain delay. I started commuting from Surrey to the Main St. Station area to fulfill an errand, right after delays began at around 2:50PM. I went through stopped trains, crowdedness of the trains and crowded-ness again when I boarded a replacement shuttle bus at Commercial-Broadway Station.

SkyTrain has been through numerous shutdowns in the past year, which many have attributed to be an issue of system reliability. In actuality, many of them the result of the lack of an auto-restart system that was neglected by BC Transit in the 1990s; some of them were genuinely due to human error; and some of them just couldn’t be prevented no matter what anyone did.

Regardless of the cause, we don’t seem to handle these very well. Doors have been broken open, resulting in people walking on the tracks unauthorized and causing further delays as track power needs to be shut down. People tend to respond loudly and angrily on social media, not waiting for the investigation to blame TransLink on whatever happens.

There’s a lot that we can learn from the Japanese when incidents like these happen. In Japan, trains are so critical to the functions of life, responsible for moving millions of people every day in a very dense country. Punctuality is considered very important, and so train operators concentrate on providing the best service possible when everything is working. It’s important to understand that things can sometimes not work – and when that happens, instructions have to be followed and anger has to be calmed. Which is why the train evacuations showcased in the video were so smooth and orderly.

This train line didn't have emergency walkways at door-level like our SkyTrain system - so passengers had to climb down ladders to get onto the track.
This train line didn’t have emergency walkways at door-level like our SkyTrain system – so passengers had to climb down ladders to get onto the track.

The most important thing to remember is that at the end of the day, these incidents don’t actually happen that often – SkyTrain has maintained a statistical reliability that tops transit systems in other cities. I pride myself over having kept myself calm throughout yesterday, and hope that other passengers who were able to do the same do so as well.

See also: Vancouverites are Spoiled with SkyTrain – Vancity Buzz

We can’t let these incidents affect the way we think about transit and play our part in shaping major transit decisions, like the recent NO vote on the regional transit referendum. It’s easy to lose sight of the facts when you’re inconvenienced and made bitter, but at the end of the day, in doing you really aren’t helping anyone.

I’m noticing many commuters on Twitter talking about how reluctant they were to take SkyTrain today. If I had let the incident from last week stop me from using the JR train line again out of fear, I wouldn’t have been able to resume with my plans to visit Himeji Castle and take these gorgeous pictures….

This slideshow requires JavaScript.

Lastly, here’s a bit from the Rocketnews article that perhaps TransLink could take from for next time…

…we think what really sealed the deal is the Japan Railways representative who shows up on the platform at the video’s 0:27 mark, ready to apologize to those who were inconvenienced and hook them up with bottles of tea, which he opens for each person who walks by. Because hey, on the occasions when you can’t be punctual, you may as well be classy.

Man tea 1

Rapid bus, SkyTrain best option for Langley

Rapid bus, SkyTrain best option for Langley

So I thought I’d put up a newsletter that the Langley Times published today, along with some added sources/notes.

For anyone that’s curious, I intend to be doing some more blogging on the BCER Interurban very shortly.

LETTERS TO THE EDITOR – Langley Times

Rapid bus, SkyTrain connection still Langley’s best option

Editor: Re: LRT announcement ignores less costly interurban option (The Times, Oct. 2)

We should welcome good transit ideas here in Langley, but there’s a reason that TramTrain isn’t one of them.

TramTrain was possible in Karlsruhe because it’s surrounded by numerous electrified regional railways. We don’t actually have that here in Vancouver; and while the BCER Interurban may seem like a tempting choice, it ran three times a day [1] and wasn’t built to service today’s cities [2].

When the province and TransLink conducted the Surrey Rapid Transit Study, the Interurban was denied because it would cost millions to retrofit yet still fall short on providing useful connections and service frequency [3]. In other words, it would be a giant waste of money.

What we do have are numerous fast highways on which we could operate inexpensive rapid buses. One of those, the Trans-Canada, now has the Fraser Valley Express (FVX) service from Carvolth Exchange to Chilliwack. This service is now providing the alternative that valley commuters asked for — but when it came time to consult locals about the FVX, Rail for the Valley did not participate [4].

That’s because Rail for the Valley’s TramTrain and LRT advocacy doesn’t come from a genuine desire to make transit better — but rather an opposition to extending SkyTrain to Langley, even though it will do the most for transit commuters.

Our SkyTrain system boasts a ridership that is higher than any LRT system in Canada and the US. That’s why over 50 cities worldwide have followed our lead by successfully employing ALRT-style driverless metros [5][6].

As an extension of an existing system, SkyTrain would have the lowest addition in annual operating costs [7]. Without transfers, commuters starting at Langley Centre Station could reach Waterfront Station within 60 minutes [8]. That’s the kind of travel time improvement that’ll get people really wanting to use public transit, and generate the fare revenue to recoup costs.

I’m all for good transit ideas; but when it comes to what will objectively serve Surrey and Langley best, rapid buses and SkyTrain are the way to go.

Daryl Dela Cruz,
Campaign manager
skytrainforsurrey.org

Footnotes

  1. BCER article in Canadian Rail No. 534 issued Jan-Feb 2010 with the writer and 4-time BCER book author, Henry Ewert, stating himself that Fraser Valley interurban trains ran 3 times per day (Mirrored on Exporail.org)
  2. An earlier technical assessment found numerous technical/construct-ability issues with interurban rail. Mirrored [HERE]
  3. Surrey Rapid Transit Study: “Compared to other alternatives, lower population and employment densities along much of the corridor and a less direct connection to Surrey City Centre would result in lower transportation benefits.” See last page of Phase II Information Boards
  4. The BC Transit Public Engagement Reports for the Fraser Valley Express, Abbotsford-Mission (CFVT) Transit Future Plan and the Abbotsford-Mission (CFVT) Efficiency Review indicate that there has been no participation by members of Rail for the Valley and other associated initiatives, with no comments on potential Interurban Rail service.
  5. The Automated Metro Observatory regularly reports on the worldwide progress of driverless transit systems. There is an expectation that the amount of fully driver-less metro systems will triple by the year 2025.
  6. In addition, numerous cities worldwide have implemented the same linear induction motor propulsion technology used by SkyTrain. A full list is on this blog: List of Linear Induction Motor rapid transit systems
  7. Funding Still Missing for LRT Operating Costs news release – SkyTrain for Surrey
  8. Based on Surrey Rapid Transit Study travel time estimates.

New TransLink CEO salary is lowest in Canada

New TransLink CEO salary is lowest in Canada

The next CEO of TransLink will earn an annual salary of almost $320,000, plus a generous benefits and bonus package.

(CBC: TransLink CEO job posting lists massive salary)

The new salary offer for TransLink’s next CEO is out and as expected, members of the public are complaining non-stop about a number that is being described by media as “massive” and “fat” as it is north of $300,000.

Earlier this year I wrote a blog post suggesting TransLink’s executive pay should be looked at in a different way, a post that was so well-received that it engaged the entire region and sent the page-view counts on this blog skyrocketing. When transportation professionals with the Victoria Transport Policy Institute quoted this blog post in a major study of theirs, I knew I had hit something right on the nail.

Now that the new CEO salary figures are out and everyone is once again relentlessly complaining, I decided to run the numbers again to see where TransLink is now against Canada’s major cities. The base salary is now in line with that of Toronto’s TTC and Montreal’s STM, but not when a bonus of up to 30% is considered:

“Greater Ottawa” in this chart counts both OC Transpo and Gatineau-Hull’s STO

But, when you consider all of the transit agencies servicing a metro area, the executive payment in this region is comparatively minuscule:

The “all” in the above chart represents all transit authorities servicing a given area. As an example, in addition to Toronto being serviced by the TTC, Mississauga is managed by Mi-Way; York Region is managed by York Regional Transit; GO Transit operates regional commuter rail and a TransLink-like regional authority called “MetroLinx” is required to tie them all together. Each of these operators has their own executives and CEOs.

Our region has 1 transit operator with 1 CEO; others have many different operators and multiple CEOs. It’s a concept that’s so simple and easy to understand, and it is absolutely crucial that we familiarize ourselves with it.

When TransLink’s context of a single, region-wide transportation authority is considered against what the region-wide setup is in Canada’s other metropolitan areas, Metro Vancouver actually has the lowest per-capita CEO salary of any major city in Canada. Even if our CEO receives a full 30% bonus.

We now pay about 17.5 cents per capita if the CEO earns a 30% bonus; whereas the people of greater Toronto pay between 1 and 12.5 more cents more for their executives (depending on what you would include as greater Toronto’s transit operators), and the people of greater Montreal each pay between 6 and 12.5 cents more.

We will also be paying our new CEO less for every revenue hour of transit service they manage, even if the CEO receives a full 30% bonus:

Top in-charge earnings per revenue hour of transit service 2015 NEW

I compiled the data for all to review here (LINK to this spreadsheet):

Outlook

Nickels for everybody! Yaaayy!
Nickels for everybody! Yaaayy!

The revised, lowered CEO salary will put a maximum of 5 cents back into people’s pockets and would not even pay for buying a single bus. Despite the relatively minimal benefits to Metro Vancouver’s citizens, attracting a new CEO will be a more difficult task with a lower offer, and TransLink should be commended considerably if and when they are able to do so.

The response a TransLink spokesperson offered in Jeff Nagel’s recent report for the Surrey Leader pretty much sums up why TransLink can’t be considered a “transit operator” in the usual vein:

“It needs to be a competitive salary,” Moore said, adding the challenge with comparing TransLink to other transit authorities is there is nothing similar in North America.

“The No side in the plebiscite wanted to compare the CEO of TransLink to one of nine CEOs in Seattle or one of eight CEOs in Toronto,” Moore said, referring to areas where multiple separate agencies do the work of TransLink. “Nobody else has an integrated rail-bus-road infrastructure.”

Pay offer for the next TransLink CEO under fire – Jeff Nagel, Surrey Leader

But, I don’t think most people are ready to understand this – it’s probably easier to think that our transit operator is a transit operator like any other, regardless of the serious differences in the way we are organized. It’s clear that much of the “NO” vote in the recent referendum was motivated by an unfavourable view of executive salaries, which were not being looked at in a proper context.

If anything, this should have an effect on how the provincial government interprets the “NO” vote altogether. At this point, the only way that the misinformation around executive salaries in this region can be offset is for someone to take leadership and recognize the serious flaws in how people have been informed on this matter.

SEE ALSO: Referendum Myths – TransLink and Executive Salary

Author’s note: This post was updated on July 27, 2015 to account for newly released numbers and other issues pointed out with the original post.

Surrey's LRT "Plan B" doesn't work

Surrey's LRT "Plan B" doesn't work

The media has done plenty of reporting on Mayor Linda Hepner’s desire to pursue a Canada Line P3 model to fund proposed Light Rail in Surrey, due the recent NO vote in the transit plebiscite.

Before decisions are taken from examples in this manner, I think it’s important to also take in the context of that example. In some of my most popular posts on this blog I’ve noted how a lack of context has done so much to skewer opinions and affect decisions in our region.

The Canada Line P3 was a successful P3 because its ridership and fare revenue exceeded projections.

The Canada Line’s P3 system works like this: The private partner signs on to build the line and operate for 30 years, and makes a capital investment to reduce the public funding burden. This capital investment in the project is returned as a profit through the performance payments made during operation.

If fare revenue from ridership meets or exceeds the costs, financing proceeds as planned and excess operating revenue is returned to the taxpayer. If the fare revenue does not exceed the costs, that represents significant additional costs to taxpayers to subsidize operations.

Thankfully, the Canada Line is exceeding its ridership projections, as a result of carefully considred design choices made during the decision-making process.

But, this is where the proposed ground-level Light Rail system for Surrey, which I have been a heavy critic of through the SkyTrain for Surrey website, runs into a very major problem.

The Surrey LRT system will not recover its operating costs.

It will run into an operating deficit of millions per year from opening day and it will struggle to recover these costs if it manages to do so at all.

Financial details for Surrey Rapid Transit, reported in the TransLink/MOTI joint study
Financial details for Surrey Rapid Transit, reported in the TransLink/MOTI joint study, on page 369

LRT’s operating deficit subsidy of $22 million ($2010) per year on opening day, growing to $28 million by 2041,  is on top of the $60 million per year for capital financing that Mayor Linda Hepner declared to the Globe and Mail. On top of all of these costs, additional costs would need to be added to the performance payments to the private operator, so that the partner can receive its return on investment.

When all inflation is accounted for, the cost of financing the P3 LRT will be nearly $100 million annually on opening day. The city will obviously need to find a way to come up with this money, and I take it that more than a few really big axes will be making their way to other city services as a result.

Plan Misses the Mark

Perhaps a part of the reason for this shortfall is because the City wants to replicate SkyTrain frequencies by running LRT trains at a 5-minute frequency, increasing to a 3-minute frequency after approximately 20 years. This frequency is not done anywhere else with driver-operated LRT systems in North America. The tendency is to run at 5-10 minute frequencies during peak hours only, reducing to 15 minute frequencies during off-peak hours and weekends.

Chart on SkyTrain vs a selection of LRT system frequencies. Made for a previous write-up on the Vancity Buzz.

The higher frequencies do not necessarily solve the many issues with an LRT system and the challenges such a system in Surrey will face. Of the $27 million in annual costs required to operate Surrey’s full LRT network, only $5 million is expected to be recovered through additional fare revenues. Cut the operating frequencies in half (resulting in significantly worse service), and there would still be a major operating deficit.

This is because many of the riders on the future LRT system will be people who already pay their fares on existing buses. They are the transit-dependent people of the city, not the people who may have the choice to continue to drive if that is what continues to serve them better.

A previous survey of Canada Line riders revealed that trip speed is the most liked aspect of the line. Street-level LRT’s limitation to slower street-level speeds will certainly create challenges in being competitive.

Ridership deficits

Surrey’s LRT will suffer these operating deficits because as a slower and less reliable grade-level system, it will not attract as many passengers as an integrated, grade-separated extension of SkyTrain. In addition, LRT will be unlike our driver-less SkyTrain system in that each train requires a driver, meaning it is more expensive to operate and will be subject to design limitations that will have a major effect on its viability.

Surrey’s LRT will carry only 2970 riders/km on opening day.4 The Canada Line, which carries 122,000 daily boardings2, required 100,000 (5200 passenger boardings per km) to cover its annual operating costs.3

As costly as infrastructure like the Canada Line SkyTrain is, the investment has been proven worthy by the benefits to the tens of thousands of people using the system daily. The investment confidence that has resulted in our SkyTrain system expansions needs to be applied to the whole system.
The driverless, grade-separated Canada Line hit its 2013 ridership projections more than 3 years ahead of schedule in 2010.

SkyTrain is a viable option

If SkyTrain is extended down Fraser Hwy. to Langley, it will carry 5443 riders per km on opening day.This is comparable to SkyTrain’s present system-wide average of 5693 riders per km.5

SkyTrain would offer faster, safer, and more reliable service – which would attract more ridership, generate more fare revenue and as a result cost only $6 million per year to subsidize operations.6 This would then be eliminated entirely with the concurrent optimization of local bus routes.7

Without an operating subsidy, SkyTrain would have a far better business case for a Canada Line-style P3 model. In any case, since the operations and maintenance component can be handled by the existing BCRTC, a newly created operating entity is not required. This will save taxpayers even more money as the P3 contract for SkyTrain would be a simpler Design-Build-Finance (DBF) model.

At the end of the day, I think there’s one particularly more significant number that exemplifies SkyTrain’s viability in Surrey over a ground-level Light Rail system.

SkyTrain would have a positive benefit/cost ratio of 1.45:1. The proposed LRT has a poor benefit/cost ratio of just 0.69:1.

A SkyTrain extension is clearly the only viable option for rail rapid transit in Surrey, and decision-makers in the city and elsewhere need to start taking a look at the hard facts.

Featured image: The SkyBridge, with the New Westminster Waterfront in the background. From the
Among other benefits, a SkyTrain extension will treat South-of-Fraser riders to a direct, transfer-less connection with the existing Expo Line to New Westminster and Vancouver.

Footnotes

According to data from the 2012 TransLink/MOTI joint study
Surrey Rapid Transit Alternatives Analysis (SRTAA) Phase 2 Evaluation
Available at [LINK HERE]

  1. SRTAA PAGE 369; Undiscounted value; measured over 30 years, with costs increasing to 2041 on year 2041
  2. ProTransBC (operator) website – http://www.protransbc.com/service-performance/
  3. TransLink media release – Addressing Canada Line capacity questions
  4. See SRTAA PAGE 301 for ridership estimates (divided by track lengths listed on SRTAA P. 347)
  5. Based on APTA ridership data from Q4 2014
  6. See attached graphic, or SRTAA PAGE 369
  7. Suggested on SRTAA PAGE 536: “For RRT 1A, savings of $170 million”

Where YES vote % was lower, more people drive (Referendum Results)

Where YES vote % was lower, more people drive (Referendum Results)

So in the wake of the NO VOTE in the Metro Vancouver Transit & Transportation Plebiscite,

Here’s an interesting collaboration I did with Kyle of 257vancouver over a Twitter conversation. After he posted a few charts with preliminary data, I asked him plot the below chart showing how the referendum YES vote correlated with the commute mode-shares for public transit and driving:

Both sets of data compare %Yes Vote. SOURCE: Twitter @257van

Notice on how the top set of grey dots, there are more dots up where the driving mode share percentage is higher, closer to the left where the yes vote percentage was lower. The opposite is generally true for those who rely on public transit.

To me this is a rather unsurprising but a very important trend to pay attention to. With at least a part of the “NO” vote outcome coming not necessarily as a result of choice of funding method or a distrust of TransLink, but as a result of any opposition to the details of the Mayors’ Council’s transit plan, I think this really says something about how we need to be looking to plan big-ticket transit expansion here in Metro Vancouver. That is, at least, if we want it to get more support for it from the public.

(HINT: a faster SkyTrain, over the proposed ground-level LRT in Surrey that barely improves transit travel times, would certainly help).

An overcrowded platform at VCC-Clark SkyTrain station. SkyTrain service cuts during all off-peak hours were among some of the "efficiency" recommendations in the recent TransLink audits.
In the meantime… welcome to the world of even more crowded buses, even more SkyTrain breakdowns, and basically even more commute-related stress whoever you are and however you go.

The "Only rail creates development" myth

The "Only rail creates development" myth

I wrote this segment as a part of the recent article I did commenting on the new study for Light Rail in Surrey. The quote from the study that caught my eye and may perhaps catch the eyes of others invested in transit planning, is this prominent suggestion that…

Unlike Rapid Bus or SkyTrain alternatives, the LRT will have a permanent physical presence in their exclusive rights-of-way and yet be at a human scale and have a gentle footprint in keeping with the lower density portions of the lines. (Surrey LRT study)

Notice how the author attempts to justify the Light Rail technology aspect in this way, by suggesting that the “permanent” presence of rail-based transit (i.e. visible rails on the street) has a positive implication on image from riders and developers, that isn’t achieved with Bus Rapid Transit (BRT).

(SkyTrain is the existing, fully grade-separated, driverless rapid transit system in Metro Vancouver)

Myth 1: Bus Rapid Transit has no “permanence”

This notion that BRT can have no “permanence” and doesn’t attract economic development is has been challenged by transportation professionals.

Investing in enhancing bus service instead of physical rails on the street is not a failure to create “permanence”. After all, rapid transit improvements are justified in the first place because the demand for the transit on that corridor is already quite high without it.

According to a new report released by the Institute for Transportation & Development Policy, BRT systems in North America are outperforming LRT in terms of how much development is generated per transit investment dollar. While the study found an LRT line in Portland had generated the most development, when this was divided per dollar of transit investment, the LRT line actually generated 31 times less development, than the system that led the per-dollar development measure: a BRT system in Cleveland.

“Per dollar of transit investment, and under similar conditions, Bus Rapid Transit leverages more transit-oriented development (T.O.D.) investment than Light Rail Transit or streetcars.”

(Institute for Transportation & Development Policy)

According to the study, the top predictors in T.O.D. outcomes are not related to the choice of technology; they are:

  1. Strong government support for redevelopment
  2. Real estate market conditions
  3. Usefulness of transit services – speed, frequency, reliability

Clearly, when the outcomes are given similar marketing and promotion, developers don’t actually care if the system uses rails or not.

Here in Canada, York Regional Transit in Ontario, with its “VIVANext” program to implement city-wide BRT, is helping to challenge the popular notion that only rail systems can reinvigorate communities. The video shows vibrant urban communities growing around future BRT stations.

Myth #2: Light Rail creates “permanence”

Light Rail is praised by supporters for creating the idea of “permanence” – which has to do with the presence of physical tracks in the streets. The suggestion is supposed to be something along the lines of, “we invested rails in this corridor so that it will never disappear.”

This is a very dangerous myth – and one of the reasons this is dangerous is because of the untold implication, wherein going straight to a Light Rail system results in other parts of the transit system lose transit service, as a means of coping with the associated costs.

Perhaps the best example of this is the downtown streetcar system in Portland, Oregon. The reveled streetcar had vibrant beginnings in its promise to provide a clean, high-quality service every 10 minutes, promoting and connecting new developments in the downtown core.

Its big-ticket issue, however, lies in the fact that it was not planned around actually improving mobility. The resulting service was not significantly more useful than existing city buses, and was often slower than walking or cycling. It was easily and frequently disrupted by accidents, poorly parked cars, and a host of other issues.


Above video: Portland Streetcar gets stuck due to a poorly parked vehicle, in what would be a minor and avoidable adjustment for a bus.

The costs that the streetcar saddled the city with didn’t help the major funding shortages affecting region-wide transit in the late 2000s, resulting in massive service cuts and cancellations throughout the region. It was so bad that in 2009, the regional operator was forced to abolish its entire 15-minute frequent transit network due to lack of funds.

Throughout its history, the streetcar has also received service cutbacks – which arguably challenge the notion that rail has “permanence”. The streetcar has never once operated at the initially promised frequencies of 10 minutes. The cutbacks were initially to the point where you would have to wait as long for a streetcar in the supposedly-vibrant city centre, as you would for a bus in a lower-density part of Surrey.

The streetcar’s ridership is so low that only 6% of the streetcar’s operating costs comes from farebox recovery. 94% of operating costs must be subsidized, and the subsidy is so heavy that it has City Auditors concerned that the streetcar is taking away from other basic services.

“We remain concerned about how projects like Portland Streetcar displace other transportation services,” referring to street maintenance.
City audit questions management of Portland Streetcar – Apr 2014

What is clear about the Portland streetcar example is that the ‘rails’ in the transit lines haven’t made any meaningful difference. They have added so little value, which ends up coming out negative against the funding issues that affected transit service throughout the region.

When the streetcars are unable to run due to an accident or some issue, the replacement shuttle buses are providing essentially the same service as the streetcars. It has had some people thinking whether Portland could follow examples here in Vancouver and in Seattle, launching a well-branded, electric trolley-bus service could have been more suitable for not just the streetcar routes, but other bus routes throughout the city as well.

A stopped TransLink articulated low-floor electric trolley. Buses like these were paid for by the additional revenue raised through low-risk bonds.
TransLink operates several articulated trolley buses here in Vancouver.

Bridging the gap between BRT and LRT

Recently, consultant Jarrett Walker’s Human Transit blog (which as you’ll notice, I’ve already referenced a few times in this write-up) mentioned that when naturally low-performing local and suburban bus services are excluded from the picture, frequent bus service is nearly as cost-efficient as LRT (in terms of the cost for every rider on the end-service).

Many advocates of LRT would rather have you look at the bus vs LRT operating costs per rider, as they apply to the entire transit system. This creates misleading attitudes surrounding buses, because the numbers include the local and suburban bus services that are naturally poor-performing (and on top of that, will likely never be replaced/justified by an LRT, ever).

This chart says two remarkable things: Firstly, that frequent bus performance is now very close to light rail performance. Secondly, that the spread between Frequent Bus and infrequent bus is usually bigger than the spread between all buses and light rail.
This chart says two remarkable things: Firstly, that frequent bus performance is now very close to light rail performance. Secondly, that the spread between Frequent Bus and infrequent bus is usually bigger than the spread between all buses and light rail.

The numbers above demonstrate that when you give buses the service quality and frequency usually associated with a more expensive LRT investment, they can be nearly as cost-efficient to operate. Likewise, if buses are also given the same amenities that add to comfort, image and sleekness, then they will likely be appreciated as much by the public.

BRT can receive the same “permanence enhancements” as LRT such as branding, way-finding information, landscaping, lighting, and dedicated rights-of-way. Many BRT systems have adopted innovative features that go a long way towards bridging the gap between BRT and LRT.

BRT advocates often cite examples in South America (such as Bogota, Colombia and others) that use BRT so extensively and so innovatively, that it is considered a replacement for heavy rail. I believe there is another worthy example that deserves some serious attention, and it’s within North America:

“Look ma, no hands”! In Eugene, Oregon, the “Emerald Express” BRT system adopted a magnetically-guided automated steering system, allowing the bus to make more precise turns and dock with precision at every BRT station. The revenue service of this guided system was introduced in June 2013 and is now celebrating its 2nd anniversary.

This guided BRT design allows for reduced lane-width requirements. Steering is automated through the electronic guidance, which only requires pavement under the wheel tracks. This provides an opportunity for the inclusion of additional green space between the tracks. The guided bus technique allows for “precision docking” at the stations.

(BRT project brief)

While the buses do need to be specially equipped, they can still run on other roads. This system does not require the extensive infrastructure and costs of previously-developed “guided” BRT systems, and can in fact save costs by allowing a tighter, narrower running right-of-way for rapid buses.

Showcase of Eugene, Oregon's Emerald Express. Taken from automated steering system study linked above.
Showcase of Eugene, Oregon’s Emerald Express right-of-way (from automated steering system study linked above)

It’s time to consider BRT

Where could you go with Bus Rapid Transit? I personally think that a lot of the potential of BRT systems is dismissed not necessarily because of disapproval, but also because the discussion is never really started. You would never be able to travel from King George & 88th and end up in South Surrey or even Coquitlam without transferring, on the currently proposed LRT system. Unfortunately, that’s been pushed out as a key consideration in transit planning here.

The Emerald Express is an excellent example of how current technology can be used to bridge the gap between BRT and LRT. And, on top of the examples showed in Eugene, there are so many other ways to “bridge the gaps”.

At this point, basically every heavily-promoted LRT feature can be replicated with BRT (and likewise, every streetcar feature with buses). Well-designed BRT systems incorporate lements such as: sheltered stations with wait-time displays, off-board payment, seating and other amenities adding comfort and ambiance. Hybrid diesel-electric or electric trolley buses can be used to lower or eliminate carbon emissions – and provide the smoother, non-jerky ride quality of electric vehicles. Plus, double-articulated buses are increasingly being used – giving a little more flexibility in terms of capacity (Light Rail’s current running advantage).

If BRT can gain more traction in this decade, it will pave the way for much better transit in all our cities, because BRT costs a lot less to implement, and has numerous flexibility advantages over Light Rail systems in urban settings. You could build more BRT than an LRT with the same dollar, and extend its reach further by through-running onto other corridors.

In order for this to happen, transit advocates must abandon any and all adherence to the “only rail creates development” myth. The fear-mongering, excuses and nay-saying from pro-LRT activists is becoming a serious setback to the realization of transit potential in our cities.

Concept image of rapid bus service instead of LRT on King George Blvd/104 Ave. Note the continuation of 3 different services to allow direct connections to Cloverdale, Coquitlam and other communities.
My concept of rapid bus service instead of LRT on King George Blvd/104 Ave in Surrey. Note the continuation of 3 different services to allow direct connections to Cloverdale, Coquitlam and other communities. Through-running flexibility is a major BRT advantage that won’t be had by currently-proposed LRT.

Calgary Light Rail system incomparable to Surrey

Calgary Light Rail system incomparable to Surrey
Responding to: If at-grade light rail does the job for Calgary, it will for Surrey too – South Fraser Blog

I was drawn to South Fraser Blog a couple of weeks ago when the webmaster commented on the concerns raised by a Township of Langley engineer over the proposed Light Rail system in Surrey. It prompted the response on this blog (Langley and Legitimacy on Light Rail Concerns), which noted numerous fallacies in the SFB article, many common and repeated among Lower Mainland LRT advocates.

Today, SFB caught my attention again with a new headline on the website declaring adamantly and proudly that “If at-grade light rail does the job for Calgary, it will for Surrey too“, a result of the webmaster (Nathan Pachal) recently visiting Calgary. Pictures are included of the Calgary LRT system, in an attempt to set an example for Surrey.

However, I immediately found many reasons to the contrary. As a first, it should be noteworthy that most of the observation wasn’t centered on the newest-opened line on the system.

Opened at the end of 2012 and adding 8.2km, the newest LRT line in Calgary is almost entirely grade-separated (including a prominent elevated segment and station), which likely wouldn’t have served the S.F.B.’s purposes to showcase at-grade rail very well at all.

And yet, the West LRT is a shining example of how Calgary has mandated its future build-out of LRT. Like many cities, Calgary has realized that more grade-separation is key to making rail rapid transit reliable, safe and competitive. Which is why the new West LRT resembles a SkyTrain extension.

Calgary’s newest West LRT. Image: Harris Rebar
Calgary’s newest West LRT. Image: Harris Rebar

Differences in context and right-of-way

As I’ve mentioned in past write-ups on the proposed Surrey LRT system, one of the things I feel is among the biggest issues is the choice on how the proposed LRT system is going to be built. All 27km of the LRT right-of-way (R.O.W.) will be at-grade, on-street, and in the middle of the street – interfacing with vehicles and pedestrians, and operating at the speed of surrounding traffic.

Calgary’s LRT system is not designed in this fashion at all. A comparative survey of LRT systems (pg. 5) measured that 93% of the system is placed on a private, segregated R.O.W. where the speed of trains exceeds 35 miles per hour (60 km/h). There will be no parts of the Surrey LRT that will be operating like this, as the maximum speed limit on city streets is 60km/h. It is atrocious to be trying to draw a comparison between two completely different types of LRT.

Unfortunately, LRT advocates have few systems to draw appropriate comparisons with. In the same aforementioned survey, all of the compared systems operate largely in either fully exclusive R.O.W.s, or other semi-separated ones at over 60km/h – making none of them comparable to the proposed system for Surrey.

These critical details are often forgotten by the Lower Mainland’s light rail advocates, because of the broad scope of systems that are called “light rail” but aren’t necessarily at all comparable.

Glimpsing Calgary’s Light Rail performance

Calgary light rail system provides consistent travel times. In Downtown Calgary, signals are timed to allow the smooth flow for light rail riders, cyclists, pedestrians, and motorists.

(Claim on South Fraser Blog)

The South Fraser Blog reasons that the C-Train’s performance is “consistent” and so will meet the standards of Surrey transit riders. Firstly, I think it’s important that claims like these get some sort of back-up so as to give readers a better idea of what’s being compared, but a link to any information is markedly absent.

So I decided to track down some of the data myself. This is what a 2010 study on the C-Train’s reliability has said about the C-Train’s (in)ability to run on-time:

Due to many issues in LRT operations, the target headway is not achieved regularly. Trains are often delayed, and the level of service is not considered satisfactory by many passengers.

(Reliability and Delay in LRT operation in Calgary – R.M.N.T. Sirisoma, S.C. Wirasinghe, D. Morgan)

The worst delays on the system happen as the lines pass through 7th Avenue in the City Centre, which is touted by S.F.B. for its on-street alignment. Despite the claimed reliability of the traffic signal sync system, 25 to 30% of all trains in both directions are delayed by more than 3 minutes.

The study does not account for technical issues like stuck doors or signal breakdowns, or for service disruptions caused by closed tracks and accidents – it is meant to measure the system’s day-to-day performance, something that’s generally not considered newsworthy as it’s what Calgarians are used to.

That means that the major incidents that can and do make the news come on top of this already not-so-stellar performance.

And with C-Train riders having to deal with as much as 57 major delays within a single month, many of them have been left relatively miserable.

Regular train rider Heather Laird says @calgarytransit has become her warning beacon for when to ride and when to drive to her job downtown.

“I keep a close eye on Twitter in the morning — delays have become so common we’re used to it.”

On-street running or on-street shoehorning?

Along 36 St NE, light rail traffic is prioritized at intersections.

(South Fraser Blog)

There’s prominent mention of the Northeast LRT’s 36 St NE section, which technically runs in the middle of a road, making it easier to draw comparisons with the proposed systems here in the South of Fraser. For numerous reasons, I still think this isn’t the case.

This is what the Northeast LRT line actually looks like:

Photo: 'Light Rail Now' group
Photo: ‘Light Rail Now’ group
Calgary LRT on 36 St NE - Photo credit: Ryan Harder, Flickr
Calgary LRT on 36 St NE – Photo credit: Ryan Harder, Flickr

36 St NE is busy, and is basically a highway. In order to “prioritize” LRT, there is a requirement of lights, crossing arms and bells at all crossings, and there are dual left turn lanes at the majority of intersections to accommodate for the lengthier train crossing delays. The result is the LRT on 36 St NE looks nothing like an urban tram system, but similar to other Calgary LRT lines placed in freeway medians – with intersections instead.

This isn’t an “on-street LRT”: this is an LRT, with its right-of-way shoehorned into a middle of the street, sharing none of the characteristics of typical on-street tram systems and completely different from the proposal for Surrey.

Photo: Light Rail Now group
Photo: Light Rail Now group

You do not even cross the street to access station platforms – all stations are accessed by pedestrian overpasses, with stairs or long circular ramps. There is virtually no community integration, and everything requires twice the land footprint of anything that would be permissible in Surrey. The ballasted track LRT R.O.W. is over 4 lanes wide at any point on the corridor.

It’s no coincidence that the S.F.B. article did not include any pictures of 36 St NE. Doing so would paint a picture of LRT that is relatively unattractive.

The confusing context of “LRT”

Light rail supporters mix “LRT” and “tram” statistics interchangeably, thus the arguments made by supporters are quite flawed: the main problem with pro-LRT activists is that the broad scope of LRT systems allows them to take bits and pieces in their argument that do not add up to the whole.

UBC SkyTrain Group – “Debunking Further Myths”, 2009

The fact that Light Rail systems come in many different shapes and sizes was first pointed out by the “UBC SkyTrain” advocacy group 6 years ago, and has been ignored by the transit community at-large ever since.

Light Rail has a confusing context. While the many similar systems that are branded as “Light Rail” do share several characteristics, I think there’s a need to pay attention to the key differences in design of these systems. What might work well for a certain LRT system may not work well at all in the other.

One of the reasons I have remained in opposition of a Surrey LRT is because of the many issues that will stem from choices in design and lack of foresight (I recently wrote on the fallacies of a new city study attempting to justify LRT, [SEE HERE]). The Calgary’s C-Train was built in a context that didn’t have these issues from the very beginning. R.O.W.s were pre-planned years before construction, and were largely located off of city streets.

But the differences are not just in specifics in design. It must also be considered that they extend to what roles the transit system is playing in a city.

The C-Train didn't build higher-density, sustainable, transit-oriented city centres like SkyTrain built Metrotown in Burnaby.
The C-Train didn’t build higher-density, sustainable, transit-oriented city centres like the ones our SkyTrain built. Shown here is Metrotown in Burnaby.

C-Trains run less frequently than our driver-less SkyTrains, especially during off-peak hours and on weekends, limiting their ability to foster transit-oriented communities with people living transit-coherent lifestyles.

As a result, C-Train is most effective at replacing cars for that final commute into the one high-density city area (downtown) – but that doesn’t mean C-Train trips are always beginning by walking, cycling or transit. Nearly every single C-Train station is complemented with a large, land-intensive park and ride – ensuring that parking can be reduced in the space-limited downtown core.

In Metro Vancouver, it's common to take the bus to reach the SkyTrain. In Calgary, the common standard is to park-and-ride.
In Metro Vancouver, it’s common to take the bus to reach the SkyTrain. In Calgary, the common standard is to park-and-ride.

Outside of this pattern, it’s a toss-up. There are few dense nodes on the LRT lines, and little variety in commuting patterns. Coherent transit usage demands good transit development and a robust city-wide transit network, but the bus system has obviously has not grown to be robust enough to prevent the need for so many huge park-and-rides. And without a robust city-wide network, it also becomes difficult to compete against commutes to areas where jobs are concentrated over lower densities (like industrial parks).

As a result, of the $6.14 billion the City of Calgary is earmarking for transportation investments in the next 10 years, 63% of that money will be going to roads – far outpacing investments in transit, walking and cycling. Clearly, the road network has remained to be of far greater economic importance than the C-Train light rail system in the city of Calgary.

If reduction in road expansion is supposed to be one of the major goals of rapid transit, then the C-Train network may as well be a colossal failure.

In conclusion,

All the Light Rail advocates I have heard from seem to have this fundamental value that it is Light Rail’s viability in Metro Vancouver and especially South of the Fraser is proven by the various examples around the world. Because we currently do not have such a system here, Light Rail has become a sensational topic among transit discussion circles.

Many of these advocates think it’s as simple of a matter as “If it works for ________, it will work for Surrey.”

As shown by the Calgary example, that is clearly not the case.